Details
The Mechanical System in this 100,000 SF computer and engineering laboratory
included two 400 ton chillers, two cooling towers, two boilers, 135
fan powered air terminals, five air handling units, and six batteries
of bathrooms.
The site utilities portion of the project included the
installation of two-way 5”, eight-way 5”, five-way 4” duct
banks, site lighting conduit, new manholes, poured in place pole
bases, and pole
lights. Installation of these systems included scheduling outages so
we could tie in to existing manholes. |