The Power projects performed
at GARDNER ZEMKE consist of Power Generation Facilities including
coal-fired, natural gas, and hydroelectric plants; substations
and switchyards; and overhead and underground transmission and
distribution systems. Our experience includes large electrical
equipment erection including step-up power transformers and generator
circuit breakers as well as isolated-phase bus systems.
We have erected dozens of substations and switchyards throughout
the Western United States through 345kV to include site preparation,
concrete foundations, steel erection, equipment installation,
overhead rigid bus installation, testing and startup.
Our transmission
and distribution expertise includes a complete range of projects
from 5 and 15kV underground distribution with
concrete encased duct banks and precast manholes to 345kV overhead
transmission. We have also performed several 115kV and 230kV
underground cabling projects with solid dielectric power cables
and terminations. |